• <em id="pai5d"></em><sup id="pai5d"></sup>
    
    

    <small id="pai5d"><rp id="pai5d"></rp></small>
    <option id="pai5d"></option>

    
    
  • <sup id="pai5d"></sup>
    <em id="pai5d"><label id="pai5d"></label></em>

  • <s id="pai5d"></s>
    當前位置 : 首頁(yè)  圖書(shū) 正文

    Strategic Lean Mapping簡(jiǎn)介,目錄書(shū)摘

    2020-02-11 14:27 來(lái)源:京東 作者:京東
    書(shū)摘
    Strategic Lean Mapping
    暫無(wú)報價(jià)
    2評論 100%好評
    編輯推薦:
    內容簡(jiǎn)介:Proven methods for diagnosing problems, improving processes, and increasing profits

    In Strategic Lean Mapping, continuous improvement expert Steven Borris reveals how to visually document your organization's processes and identify problematic issues. Find out how to blend and then apply select techniques from Lean Manufacturing, Theory of Constraints, RCM (Reliability-Centered Maintenance), TPM (Total Productive Maintenance), OEE (Overall Equipment Efficiency), and other methodologies to implement the perfect solution to the task at hand. Diagrams, charts, and real-world case studies help you to put the concepts presented into practice. This hands-on guide will help small companies, large global organizations, and government agencies alike find ideal solutions for individual processes or projects.

    Coverage includes:


    Finding improvement opportunities
    The five principles of Lean
    The seven wastes of Lean
    The big picture map
    SWOT (strengths, weaknesses, opportunities, and threats) analysis
    Process mapping
    Capacity mapping
    Lean Manufacturing, the value-stream map, and partial value
    Problem solving and decision making
    作者簡(jiǎn)介:Steve Borris is a manufacturing advisor and continuous improvement specialist in the science, food and drink, electronics, textile, optics, electro-mechanics, medicine, and semiconductor industries. His technical expertise includes equipment installation and maintenance, root-cause fault resolution, equipment redesign, calibration, customer support, commissioning, and training. Mr. Borris is currently with SMAS, a Scottish government agency tasked with improving the efficiencies of companies. He also is the author of Total Productive Maintenance (McGraw-Hill, 2006).
    目錄:Introduction
    Reasons for not using continuous improvement techniques; Why is it important that the initiative works and is sustained; The Capacity Map, Capacity Bar Chart, Value and Capacity Stream Map and Decision Flow Chart; Why Mapping; Culture; So how does Mapping Work
    Ch. 1: The Storm Before the Calm
    Turnover vs. Profit; Losses and the 7 Wastes; Adapting to New Techniques; Blending the best of techniques to increase the power of the process; How do I diagnose and analyze the process; Resistance to first projects; Productivity Tip: Short Interval Control; OEE – Overall Equipment Efficiency – Performance, Quality, and Equipment Availability; Culture from small companies to global organizations
    Ch. 2: Finding Improvement Opportunities
    The Value Stream Map; Adding SOME Value; Right first time; Example: Root-cause; Size isn't everything; Customer audits; the 5 Principles of Lean; Productivity Tip: Brainstorming; Big Picture Map; Plan Do Check Act; Process Maps; Quantifying Losses; The 7 Wastes
    Ch. 3: The Big Picture Map
    SWOT Diagram; Big Picture Map vs. Process Map; Production Logs; Employee input; The Parking Lot; Material Flow; Kanban and controlling material flow; Step 1: Materials; Lean Note; Step 2: Information Flow; Step 3: Data Flow and Data Boxes; On Time and In Full Deliveries; Step 4: Lead Times; Step 5: Inventory and Stock Points; Step 6: Quality Check Points; Step 7: Rework and Scrap loops; The future State Map; Solutions
    Ch. 4: Process Mapping
    The team; Creating the Map; Types of Process Layouts; What are the 7 Wastes
    Ch. 5: Capacity Mapping
    Where capacity maps should be used; The Cabinet manufacturer
    Ch. 6: Lean Manufacturing
    Mass Production; Continuous Improvement Lean Manufacturing; Value; The Value Stream; Flow; Pull; Perfection; Transporting; Inventory; Movement; Waiting; Over-Production; Over-Processing; Defects
    Ch. 7: Problem Solving and Decision Making
    Root-cause and evaluating losses; Step 1: Identify the project or problem to be solved; Step 2: Create the improvement team; Step 3: Define the exact problem; Step 4: Quantify the problem; Step 5: Plan the project; Step 6: Solve the problem; Step 7: Circulate the Results; Step 8: Embed the Solution; Brainstorming; The 5 Whys; Fishbone Diagram; CEDAC diagram; Fault Tree Analysis; Consequences of a wrong solution to a problem being applied; Minimize risks.
    Steve Borris is a manufacturing advisor and continuous improvement specialist in the science, food and drink, electronics, textile, optics, electro-mechanics, medicine, and semiconductor industries. His technical expertise includes equipment installation and maintenance, root-cause fault resolution, equipment redesign, calibration, customer support, commissioning, and training. Mr. Borris is currently with SMAS, a Scottish government agency tasked with improving the efficiencies of companies. He also is the author of Total Productive Maintenance (McGraw-Hill, 2006).
    熱門(mén)推薦文章
    相關(guān)優(yōu)評榜
    品類(lèi)齊全,輕松購物 多倉直發(fā),極速配送 正品行貨,精致服務(wù) 天天低價(jià),暢選無(wú)憂(yōu)
    購物指南
    購物流程
    會(huì )員介紹
    生活旅行/團購
    常見(jiàn)問(wèn)題
    大家電
    聯(lián)系客服
    配送方式
    上門(mén)自提
    211限時(shí)達
    配送服務(wù)查詢(xún)
    配送費收取標準
    海外配送
    支付方式
    貨到付款
    在線(xiàn)支付
    分期付款
    郵局匯款
    公司轉賬
    售后服務(wù)
    售后政策
    價(jià)格保護
    退款說(shuō)明
    返修/退換貨
    取消訂單
    特色服務(wù)
    奪寶島
    DIY裝機
    延保服務(wù)
    京東E卡
    京東通信
    京東JD+
    亚洲精品乱码久久久97_国产伦子一区二区三区_久久99精品久久久欧美_天天看片永久av影城网页
  • <em id="pai5d"></em><sup id="pai5d"></sup>
    
    

    <small id="pai5d"><rp id="pai5d"></rp></small>
    <option id="pai5d"></option>

    
    
  • <sup id="pai5d"></sup>
    <em id="pai5d"><label id="pai5d"></label></em>

  • <s id="pai5d"></s>